Flow Consulting Engineers has the capacity to handle small or large civil projects.  Our capabilities are described in the following projects which we have completed.

Defence

In April 2020 Boeing Defence Australia (Boeing) requested FCE to prepare design drawings and a construction work specification to allow the construction of the E2 compound project (which was a large extension to the existing security compound) at the ADSCS.  Design included buried conduit installation, roadworks and kerbing, culverts and drainage and security fencing.

In 2019 were awarded the project by Boeing to prepare design drawings and a construction work specification to assist with the construction of two concrete creek crossings and gravel approaches, at two creek crossing sites within the ADSCS buffer zone.  Bund walls were designed to assist to channel overland stormwater flow away from the roadworks to prevent scour of the roadworks occurring in the future.

FCE have in 2018 successfully delivered the documentation and project supervision for the midway gate project to meet the SAFEBASE security requirements at the ADSCS site for Boeing.  The project was complex and required cabling, automatic barrier gates, earthworks, and road widening.  FCE’s documentation was extremely comprehensive and well received by the Contractor.  The project was administered easily and within time and financial budgets. 

Residential Subdivisions

Supervision and certification of Glenfield Beach, Batavia Marina & Karloo subdivisions for CEM in 2015 to 2017.  Supervision of the Aldi supermarket site earthworks for Wormal in 2017. 

FCE assisted Central Earthmoving Company Pty Ltd in 2017 with the Beresford Foreshore Coastal Protection and Enhancement Project which include groyne, breakwater, and revetment construction.  The construction of the rock structures requires the supply of suitable limestone rock underlayer and amour rock.  FCE have been engaged by Centrals to assist in providing documentation to demonstrate that the imported rock to be supplied complies with the requirements of the project specification. 

Mining & Processing

FCE were appointed the site civil works supervisor for the $2M construction of Recovery Dam 7 at Iluka Resources Geraldton Narngulu Plant in 2011.  FCE assisted with earthworks design, supervision of dam lifts and compaction.